“What if I pay for plans and my lot doesn’t work?”
We walk your lot before anything is drawn — setbacks, access, slope, and where an ADU actually fits. Free, no obligation.
Free ADU calculator · San Diego County
See what a backyard ADU could cost on your property in 4 quick taps.
As seen in Katrine’s videoFilmed at a real BNC ADU in Poway
Why most ADU plans stall
“What if I pay for plans and my lot doesn’t work?”
We walk your lot before anything is drawn — setbacks, access, slope, and where an ADU actually fits. Free, no obligation.
“What about surprise costs?”
The big swing items — utility & sewer runs, electrical panel capacity, grading — are exactly what we look at on the visit, so they’re on the table up front.
“Permits sound like a nightmare.”
One team handles it all: design, engineering, permits, build, and inspections. One point of accountability.
“Will the contractor disappear?”
Licensed (CSLB #1050284), insured, with a local office at 101 State Pl, Escondido — and a written workmanship warranty card at handover.
Real BNC ADUs · no stock photos
Swipe through finished BNC ADUs in Poway and Escondido.







How it works
4 taps. See your build range — and San Diego rent potential — instantly.
We walk your lot with you: what fits, what it really takes, and your permit path.
Design, engineering, permits, build, and inspections — one BNC team, start to finish.
Typical ADU timeline is about 8–14 months from design through permits and construction, depending on your city and site.
A local builder, not a call center



Straight answers
No — it’s a preliminary range from your answers. Site work, utility runs, design choices, and your city’s fees all move the final number. That’s exactly what the free on-site visit is for.
A BNC team member comes to your property, walks the lot with you, and talks through where an ADU fits, what could affect cost (utilities, sewer, electrical panel, slope, access), your permit path, and timing. No pressure and no obligation.
Things only a site visit can confirm: long utility or sewer runs, electrical service upgrades, major grading or retaining walls, and city/school impact fees. We point these out on the visit, before you commit to anything.
Typically about 8–14 months total, including design, permits, and construction. Your city and site conditions are the biggest factors.
It’s a planning range for San Diego County ADUs by bedroom count, based on 2025–2026 lease data for ADUs and HUD FY2027 Fair Market Rents. Actual rent depends on your neighborhood, size, finishes, and parking — it’s not a guarantee.
San Diego County, including Escondido, Poway, San Marcos, Vista, Carlsbad, Oceanside, Encinitas, Rancho Bernardo, Fallbrook, Valley Center, and the City of San Diego.
Sí. Hablamos español — llámenos al (760) 658-6238.
Or call (760) 658-6238 · Mon–Sat 8am–5pm